Smart Production Organisation
- Client
- World market leader for contact lenses
- Via
- objective partner
- Period
- 09.2022 to 12.2022
- Role
- Full-stack developer, architect
A calendar and scheduler where several departments align their production planning with one another.
Coordination across departments
The planning system itself sat with the production planners. This piece brought the departments to one table: in the planning meetings they aligned their dates, with someone from production planning in the room to bring the timing together. As a full-stack developer and architect I built in backend and frontend, ran architecture and code reviews, gathered requirements, and supported the team on questions of architecture and development.
Built with
- Java
- TypeScript
- Spring Boot
- Angular
- PostgreSQL
- Docker
- Kendo UI
- JPA
- Flyway
- Keycloak
Back to work